The Arthur-Laberge Bridge is a thin-slab bridge cast in place on steel beams. The bridge abutments underwent major concrete work (mass concrete pouring). The mandate also included rebuilding the municipal approaches: municipal services, infrastructure, and granular foundation for an urban boulevard and access ramp, as well as the construction of a bike path connecting the two banks.

Client: Ministère des transports du Québec (MTQ)

Years: 2014-2015

Total project cost: ± $11.5 million

Services/Expertises: Materials engineering